A lift rarely breaks down at a convenient time.
It stops during the morning rush in an office building, when a hotel is fully occupied or while a shopping centre is experiencing its busiest trading period.
By the time the engineer arrives, queues may have formed, accessibility may have been restricted and staff may already be dealing with complaints.
Some lift downtime is unavoidable. Components wear, unexpected faults occur and essential repairs occasionally require equipment to be taken out of service.
However, repeated or extended downtime is often a sign that maintenance, communication or long-term planning needs to improve.
Use Preventative Lift Maintenance
The most effective way to reduce downtime is to identify problems before they stop the lift.
Preventative maintenance allows engineers to inspect key components and look for:
- Wear
- Loose connections
- Door problems
- Lubrication issues
- Poor levelling
- Unusual noises
- Control faults
- Deteriorating safety equipment
A developing issue may be relatively simple to correct during a planned visit.
If it is ignored until failure, the same problem could require an emergency call-out and leave the lift unavailable while parts are sourced.
Choose the Right Maintenance Frequency
A generic maintenance schedule may not reflect how the building actually uses its lift.
The appropriate frequency should consider:
- Daily journeys
- Passenger numbers
- Operating hours
- Lift age
- Number of floors
- Load patterns
- Building type
- Previous breakdowns
- Availability of alternative lifts
A busy hotel or large office may benefit from monthly maintenance, while a lightly used lift may be suitable for a different schedule.
The maintenance frequency should be reviewed when building occupancy or lift usage changes.
Report Small Faults Before They Become Breakdowns
Many serious failures begin with warning signs that appear minor.
Building users may notice:
- Doors reopening
- Delayed movement
- Unusual sounds
- Intermittent buttons
- Poor floor levelling
- Vibration
- Slower journeys
- Sudden changes in ride quality
These symptoms should be reported immediately.
Waiting until the lift stops completely removes the opportunity to investigate the problem during planned operating hours.
Improve the Quality of Fault Reports
An engineer can diagnose a fault more quickly when accurate information is available.
A useful report should include:
- Which lift is affected
- Date and time
- Starting floor
- Destination floor
- What happened
- Any warning message
- Whether passengers were inside
- Whether the fault cleared
- Unusual noise or movement
- Whether the problem has happened before
Statements such as “the lift is not working properly” provide very little diagnostic value.
Detailed records can reveal patterns that an intermittent fault may otherwise conceal.
Keep Maintenance and Breakdown Records
Every service visit and call-out should create a written record.
Over time, these reports can show:
- Which faults repeat
- Which parts fail regularly
- Whether one lift is less reliable
- How often emergency call-outs occur
- Whether recommended repairs were completed
- Whether downtime is increasing
This information helps building managers move from reactive repair decisions to evidence-based planning.
Approve Important Repairs Promptly
Delays often occur after the fault has been diagnosed.
The lift company may identify the required repair, but the building’s internal approval process can prevent the work from progressing.
To reduce delays:
- Establish repair authorisation limits
- Identify who can approve urgent work
- Keep contact details current
- Agree how quotations will be issued
- Make budget holders aware of critical risks
- Respond promptly to technical questions
A lift should not remain unavailable for days because nobody knows who can approve the quotation.
Plan for Critical Replacement Parts
Downtime can become extended when a required part is unavailable.
Older lifts may be particularly vulnerable because some components are no longer manufactured.
Building managers should ask their maintenance provider:
- Which components are becoming obsolete?
- Are common replacement parts readily available?
- Could critical spares be held?
- Can obsolete systems be upgraded?
- How long would major parts take to obtain?
- Are temporary repairs likely to be reliable?
Where a component presents a significant operational risk, planned replacement may be safer than waiting for failure.
Reduce Damage Caused by Misuse
Not every breakdown results from mechanical ageing.
Lifts can be damaged by:
- Overloading
- Obstructing doors
- Forcing doors open
- Moving unsuitable goods
- Striking entrances with trolleys
- Liquid spillages
- Debris in door tracks
- Vandalism
Clear signage, staff training and prompt reporting can reduce avoidable damage.
Goods movements should use suitable equipment rather than placing unnecessary pressure on passenger lifts.
Review Repeated Door Faults
Lift doors are among the hardest-working parts of the system.
Every journey can involve several opening and closing movements.
Problems may be caused by:
- Worn rollers
- Damaged tracks
- Misalignment
- Obstructions
- Faulty sensors
- Worn operators
- Damaged landing equipment
Repeatedly resetting a door fault without correcting the underlying issue is likely to result in further downtime.
Modernise Obsolete Equipment
Maintenance cannot indefinitely compensate for unsupported technology.
Modernisation may be appropriate when:
- Parts are no longer available
- Control faults are increasing
- Repairs are becoming temporary
- Downtime is getting longer
- Engineer support is limited
- The lift no longer meets building demand
Replacing an obsolete control system or unreliable door operator can reduce future breakdown risk without necessarily replacing the entire lift.
Arrange Maintenance at Sensible Times
Planned downtime is easier to manage than an emergency breakdown.
Maintenance and larger repairs can often be scheduled:
- Outside peak operating hours
- During quieter trading periods
- When building occupancy is lower
- When another lift remains available
- During planned closures
- Alongside wider refurbishment work
Advance notice allows staff, tenants and visitors to make alternative arrangements.
Create a Lift Breakdown Plan
Building teams should know what to do before a lift fails.
The plan should cover:
- Who reports the fault
- Which maintenance company to contact
- What information to provide
- How to prevent further use
- How to manage accessibility
- How to communicate with occupants
- Who approves repairs
- What happens outside normal hours
A clear procedure prevents confusion and reduces delays during an already disruptive situation.
Measure Your Maintenance Provider’s Performance
A maintenance contract should be assessed on more than the number of scheduled visits.
Monitor:
- Breakdown frequency
- Response times
- First-time repair rates
- Repeated faults
- Communication quality
- Report detail
- Quotation times
- Duration of downtime
If the same problems continue despite repeated attendance, it may be necessary to review the maintenance strategy or provider.
Building a More Reliable Lift Operation
Reducing lift downtime requires planned maintenance, accurate reporting and timely investment.
No single action can prevent every fault, but a coordinated approach can reduce how often breakdowns occur and how long they last.
Excel Lifts can review your maintenance history, inspect existing equipment and help create a practical plan for improving reliability across commercial buildings.